Kreate Hull KR North Stand

Kreate Hull KR North Stand

  • Project Value: £1.7 million
  • Contractor: Hobson & Porter
  • Client: Hull Kingston Rovers
  • Sector: Leisure
  • Duration: 28 weeks

Scope

  • VRF (variable refrigerant flow) heating and cooling to Office and Conference rooms.
  • Ventilation via heat recovery air handling units.
  • Kitchen catering facilities, ventilation, gas, hot and cold and electric extract hoods.
  • LTHW heating to door heaters, radiators, air handling units, hot water plant and underfloor heating.
  • Solar thermal domestic hot water.
  • HV/LV distribution.
  • Small power installations.
  • Lighting and emergency lighting.
  • Training facility flood lights.
  • Stadium pitch lighting.
  • Data cabling and containment.
  • Photovoltaic panels.
  • Fire alarms.
  • CCTV and match day surveillance systems.
  • Access control systems.
  • Smoke ventilation to stairs.

Brief
Tucker M&E provided a full design and build package at top rugby lead team Hull Kingston Rovers Light stream Stadium. The project included training facilities, a 2600 seat stand, corporate boxes, conference facilities and enterprise managed workspaces, with facilities for start-up business.

Kingston Rovers

Get in touch with us today and lets chat.