Kreate Hull KR North Stand
Kreate Hull KR North Stand
- Project Value: £1.7 million
- Contractor: Hobson & Porter
- Client: Hull Kingston Rovers
- Sector: Leisure
- Duration: 28 weeks
Scope
- VRF (variable refrigerant flow) heating and cooling to Office and Conference rooms.
- Ventilation via heat recovery air handling units.
- Kitchen catering facilities, ventilation, gas, hot and cold and electric extract hoods.
- LTHW heating to door heaters, radiators, air handling units, hot water plant and underfloor heating.
- Solar thermal domestic hot water.
- HV/LV distribution.
- Small power installations.
- Lighting and emergency lighting.
- Training facility flood lights.
- Stadium pitch lighting.
- Data cabling and containment.
- Photovoltaic panels.
- Fire alarms.
- CCTV and match day surveillance systems.
- Access control systems.
- Smoke ventilation to stairs.
Brief
Tucker M&E provided a full design and build package at top rugby lead team Hull Kingston Rovers Light stream Stadium. The project included training facilities, a 2600 seat stand, corporate boxes, conference facilities and enterprise managed workspaces, with facilities for start-up business.