Haltemprice Leisure Centre

Haltemprice Leisure Centre

  • Project Value: £700,000
  • Contractor: Hobson & Porter
  • Client: East Riding of Yorkshire Council
  • Sector: Public / Leisure
  • Duration: 50 weeks

Scope

  • New gas fired heating serving all areas utilising LTHW pipework and plant.
  • Combined heat and power unit to add efficiency and reduce carbon duty.
  • New dry and wet changing area ventilation systems.
  • New hot water plant inc solar thermal.
  • VRF and heating recovery ventilation to the Doctor’s Surgery.
  • New Conference Room VRF (variable refrigerant flow) and heat reclaim ventilation.
  • New gym ventilation and cooling equipment.
  • New sanitary-ware and above ground drainage.

Brief
Tucker M&E undertook the mechanical installations to fully re-furbish this local leisure facility. As well as the gym, swimming pool and badminton court you would normally expect, the building now incorporates a GP surgery and library.

Get in touch with us today and lets chat.