Bridgehead Office Development
Bridgehead Office Development
- Project Value: £400 – £500k
- Contractor: PDR Construction
- Client: Wykeland
- Sector: Commercial
- Duration: Approx 20 weeks
Scope
- LV distribution and small power installation.
- Lighting and emergency lighting.
- Fire alarm installations.
- Data cabling and containment.
- Lightning protection.
- Photovoltaic installations.
- Disabled services.
- External gas, water and electric infrastructure.
- VRF heating and cooling systems.
- Ventilation via heat recovery systems.
- Automatic and BMS control systems.
- Sanitary-ware and above ground drainage.
- Hot and cold water systems.
Brief
Tucker M&E have undertaken a number of multi-storey office blocks on this new business park. The projects are M&E design and build and generally include a spec fit out prior to a tenant leasing the building.
Get in touch with us today and lets chat.