Bridgehead Office Development

Bridgehead Office Development

  • Project Value: £400 – £500k
  • Contractor: PDR Construction
  • Client: Wykeland
  • Sector: Commercial
  • Duration: Approx 20 weeks

Scope

  • LV distribution and small power installation.
  • Lighting and emergency lighting.
  • Fire alarm installations.
  • Data cabling and containment.
  • Lightning protection.
  • Photovoltaic installations.
  • Disabled services.
  • External gas, water and electric infrastructure.
  • VRF heating and cooling systems.
  • Ventilation via heat recovery systems.
  • Automatic and BMS control systems.
  • Sanitary-ware and above ground drainage.
  • Hot and cold water systems.

Brief
Tucker M&E have undertaken a number of multi-storey office blocks on this new business park. The projects are M&E design and build and generally include a spec fit out prior to a tenant leasing the building.

office

Get in touch with us today and lets chat.