Pure Gym New Site Roll Out

Pure Gym New Site Roll Out

  • Project Value: Each gym ranging from £120k to £180k
  • Contractor: Sivil Design and Build Ltd
  • Client: Pure Gym
  • Sector: Public / Leisure
  • Duration: Various

Scope
This has involved the mechanical installation for over 50 gyms, each gym requiring the following scope of works:

  • Ventilation to the gym floor areas, toilets and changing facilities.
  • Heating and cooling via VRF (variable refrigerant flow) and multi split air conditioning systems.
  • Hot and cold water services with gas fired or electric boiler plants.
  • Sanitary-ware and above ground drainage.
  • Fire and smoke ventilation.

Brief
Pure Gym is the largest UK gym chain with over 180 gyms nationwide. Over the last four years Tucker M&E have been involved with their new gym roll out.
Our involvement as mechanical design and build contractor involves pre-acquisition due diligence of a property, then the scope of works for landlord’s approval prior to fit out of the property and consent drawing, followed by construction design and installation.

Project Challenges
There are a number of challenges we were faced with on these projects, namely that each project is completely different as the building ranged from spec, retail units to basements. Suitable locations for plant externally and issues with adjoining properties all have to be resolved in these bespoke fit outs. The time scales and project lead in time are generally very tight and this involves a very collaborative work with the main contractor and other sub-contractors.

facility